Chiudi

Aggiungi l'articolo in

Chiudi
Aggiunto

L’articolo è stato aggiunto alla lista dei desideri

Chiudi

Crea nuova lista

Offerta imperdibile
Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory: Interim Status Report - Committee for the Technical Assessment of Environmental Programs at the Los Alamos National Laboratory,Nuclear and Radiation Studies Board,Division on Earth and Life Studies - cover
Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory: Interim Status Report - Committee for the Technical Assessment of Environmental Programs at the Los Alamos National Laboratory,Nuclear and Radiation Studies Board,Division on Earth and Life Studies - cover
Dati e Statistiche
Wishlist Salvato in 0 liste dei desideri
Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory: Interim Status Report
Disponibilità in 4/5 settimane
12,81 €
12,81 €
Disp. in 4/5 settimane
Chiudi

Altre offerte vendute e spedite dai nostri venditori

Altri venditori
Prezzo e spese di spedizione
ibs
Spedizione Gratis
12,81 €
Vai alla scheda completa
Altri venditori
Prezzo e spese di spedizione
ibs
Spedizione Gratis
12,81 €
Vai alla scheda completa
Altri venditori
Prezzo e spese di spedizione
Chiudi
ibs
Chiudi

Tutti i formati ed edizioni

Chiudi
Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory: Interim Status Report - Committee for the Technical Assessment of Environmental Programs at the Los Alamos National Laboratory,Nuclear and Radiation Studies Board,Division on Earth and Life Studies - cover
Chiudi

Promo attive (0)

Descrizione


Discharges of wastes from activities associated with the federal governmentaEURO (TM)s Los Alamos site in northern New Mexico began during the Manhattan Project in 1943. Now designated the Los Alamos National Laboratory (LANL), the site is operated under contract by the Department of Energy (DOE). Through past and ongoing investigations, radioactive and chemical contaminants have been detected in parts of the complex system of groundwater beneath the site. Since effective protection of groundwater is important for LANLaEURO (TM)s continuing operations, DOEaEURO (TM)s Office of Environmental Management requested technical advice and recommendations regarding several aspects of LANLaEURO (TM)s groundwater protection program. This interim report summarizes the committeeaEURO (TM)s information-gathering activities and identifies issues within the scope of its task that have risen to the committeeaEURO (TM)s attention without offering any findings or recommendations. The final report is expected to be released in May 2007 and it is the hope that results of the final study will provide guidance and impetus for dialogue and agreement among DOE, LANL, and other stakeholders on a focused, cost-effective program for protecting the groundwater in and around the site.
Leggi di più Leggi di meno

Dettagli

Testo in English
279 x 216 mm
9780309103916
Chiudi
Aggiunto

L'articolo è stato aggiunto al carrello

Chiudi

Aggiungi l'articolo in

Chiudi
Aggiunto

L’articolo è stato aggiunto alla lista dei desideri

Chiudi

Crea nuova lista

Chiudi

Chiudi

Siamo spiacenti si è verificato un errore imprevisto, la preghiamo di riprovare.

Chiudi

Verrai avvisato via email sulle novità di Nome Autore